-- card: 81289 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 64774 -- name: Setting Lag Times -- part 3 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=238 top=59 right=87 bottom=460 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 8 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=58 right=269 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: -- part 9 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part 1 (button) -- low flags: 00 -- high flags: A003 -- rect: left=15 top=150 right=170 bottom=197 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Lag Times ----- HyperTalk script ----- on mouseUp go card id 36346 end mouseUp -- part 10 (button) -- low flags: 00 -- high flags: A003 -- rect: left=257 top=132 right=151 bottom=442 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Lag Time Dialog Box ----- HyperTalk script ----- on mouseUp go card id 77420 end mouseUp -- part contents for background part 31 ----- text ----- Setting Up a Project -- part contents for background part 32 ----- text ----- Setting Lag Times -- part contents for card part 3 ----- text ----- To add finish-to-start lag between two tasks: -- part contents for background part 6 ----- text ----- -- part contents for background part 27 ----- text ----- -- part contents for background part 7 ----- text ----- Select the line connecting the two tasks. Choose Lag Time from the Task menu. In the Lag Duration field, type the number of units of lag time you want to add between the end of the first task and the start of the second task. Click OK. -- part contents for background part 28 ----- text ----- 1. 2. 3. 4. -- part contents for card part 8 ----- text ----- You can specify the amount of time between the finish of one task and the start of another (finish-to-start lag), or the amount of time between the start of one task and the start of another (start-to-start lag). Important: Lag time may affect some dates in the Schedule Chart, but it is only displayed on the dependency line between two tasks. Lag time is not part of—or the same as—task duration or resource duration. -- part contents for card part 9 ----- text ----- 1 of 2